Back wall is up, and a roof is covering the production area. Now to finish sheeting, finish exterior covering for wall, apply foam to the roof, and put the roofing on.
This picture is of the production area facing South. The posts will separate a hallway to the left from the main production area. The hallway will lead to our emergency exit. Production area is everything to the right of the posts. With nice high ceilings we should have room for larger equipment in case we need to up our production.